System Jennifer

From Seda's Enhancements
Revision as of 07:46, 16 January 2024 by Seda (talk | contribs)
Jump to navigation Jump to search
Original system artwork by Shadowdancer, 2013.
LaunchedDecember 2012
DiscontinuedCurrent
Flagship2012-2019
Built By
History
Predecessor(s)System Sophie
Successor(s)System Raven

System Jennifer is a Flagship Workstation operating as part of the Seda's Enhancements test network.

History

Project Titanium

Jennifer was designed under the codename Project Titanium

During the late development of Delta Network Scripts, it became clear that something new was required. Most of the components for the system were selected as early as 2011; but due to a busy life schedule the system was only assembled in December, 2012.

The goals for Project Titanium were simple;

  • Long-term serviceability
  • Long-term viability
  • Ability to run in very hot environments

Jennifer was originally intended to run for 7 years. That has obviously been exceeded.

Cost

Jennifer cost over $6,100 AUD at time of construction.

Current Status

Jennifer is used for compatibility and performance testing with every piece of code that makes it into each release of the software.